Browse all practice questions for the NASCLA Commercial Construction Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

NASCLA Commercial Construction Practice Exam course image
All questions

These questions are part of the practice quiz. Start practicing

  • What effect does value engineering have on the cost of a project?
  • What is the minimum height for guardrails on elevated surfaces in construction?
  • In terms of size, terrazzo flooring tiles should not be more than what percentage longer than they are wide?
  • What is the shrinkage factor commonly associated with loam?
  • What is the primary purpose of building codes in commercial construction?
  • What is the name of the voluntary building certification program that establishes a common standard of high performance green building?
  • What does 'workman’s compensation insurance' cover?
  • In finishing concrete, which step is typically performed last?
  • Where do estimators acquire the quantity of materials needed for a bid?
  • What should be ensured before pouring concrete?
  • When installing a terrazzo slab, how should all plumbing and electrical conduits be positioned?
  • What type of insurance protects against claims for bodily injury or property damage during construction?
  • What is the role of a general contractor?
  • If a project has no float time, what does that indicate?
  • What is a 'change management plan' in project management?
  • On average, how many pounds of waste per square foot of building area do new construction projects generate?
  • What is the best method to limit exposure to VOCs?
  • In what order should concrete finishing tasks be completed?
  • What strategy can help reduce costs and optimize worker productivity on a jobsite?
  • What is the primary purpose of a construction site safety plan?
  • What is the ideal temperature for a building when installing wood floors?
  • Which type of bonding is never allowed in a subpanel according to electrical code?
  • In construction, what is a 'letter of intent'?
  • What does counter flashing cover?
  • What are 'change orders' in the context of construction contracts?
  • When pouring a composite floor on a steel deck, what is the minimum thickness of cast-in-place concrete above the deck flutes?
  • What type of bond guarantees that a contractor will complete a project?
  • What examines initial operating and maintenance cost as well as future benefits over the life of a building or systems in the building?
  • What is the significance of LEED certification?
  • Which type of insulation is commonly used in walls?
  • What is an acceptable variation when placing stirrups?
  • Every fourth pair of rafters should be installed with what type of tie?
  • What is the primary role of an architect in a construction project?
  • What is the method used to keep unfaced wall insulation in place?
  • What is typically the first step in the value engineering process?
  • What type of concrete should be maintained above 50°F and in a moist condition for at least 3 days?
  • What kind of pressure is intended when using sheet pile?
  • What is the term for the formal offering to perform work at a specified price?
  • NEPA applies to construction sites that are considered what?
  • What does the acronym BIM refer to in construction?
  • What is the diameter of #4 rebar in a bundle?
  • What is a primary purpose of a construction schedule?
  • What is the difference in width between a 2x6 framing wood and a 2x6 metal stud?
  • What does the backing paper on batt insulation primarily act as?
  • Which type of construction contract involves paying the contractor based on actual costs plus a fee?
  • What is required on rafters that do not support a ceiling and are spaced 16 inches on center?
  • What type of pipe should be used for foundation drainage?
  • When is a painter allowed to begin work if drywall installation is scheduled to be completed 30 days after it begins?
  • Cash flow projections should relate to which aspect of the project?
  • What is the importance of conducting inspections during a construction project?
  • What are 'soft costs' in commercial construction?
  • What does 'construction delays' typically refer to?
  • What is a primary goal of cost estimation in construction?
  • What form is typically used to solicit bids from contractors?
  • What essential information is typically contained in as-built drawings regarding alterations made during construction?
  • What is the primary purpose of construction project scheduling?
  • What effect does moisture have on expansive soils?
  • What standards must commissioning, testing, and balancing of mechanical systems meet?
  • What is the purpose of installing felt under oak flooring?
  • Which phase of a construction project commonly employs value engineering techniques?
  • What is meant by 'early completion incentive'?
  • What might trigger the application of liquidated damages?
  • What is a 'notice of non-responsibility'?
  • Which type of copper pipe is most commonly used in homes?
  • As-built drawings also include documentation of which of the following?
  • What strategy is used to analyze the cost-benefit of different project options?
  • What is a 'site plan'?
  • Why are progress meetings essential in construction management?
  • What type of cash flow curve is characterized by a steep initial section?
  • Which document is typically used to define the scope of work in a construction project?
  • When can shoring be removed from concrete forms?
  • What are irregularities in rebar typically a result of?
  • What does the term 'subcontractor' mean in construction?
  • What does OSHA stand for?
  • What is the role of a construction manager?
  • What type of insurance is most commonly required for construction workers?
  • What is the significance of a contractually defined 'schedule of values'?
  • What is the minimum size of gravel that can be used to backfill a trench of a silt fence?
  • What is a building permit?
  • What does the term 'excusable delay' mean in a construction contract?
  • What type of project component usually does not require shop drawings as part of the required submittal?
  • What is the term for a legal claim against a property owner's title due to unpaid work or materials?
  • What provides longitudinal stability in a pre-engineered and prefabricated metal frame structure?
  • Which document outlines the rights and responsibilities of parties in a construction project?
  • What does 'substantial completion' mean in construction?
  • What material could potentially be present in buildings constructed prior to 1980?
  • In commercial construction budgets, what are 'hard costs'?
  • What is the primary purpose of value management or value engineering for a construction project?
  • What type of device should protect hose connections such as silcock's and hose bibs?
  • Which phase of construction involves determining project feasibility and stakeholder involvement?
  • What designation does a structural bolt made from alloy steel with higher strength carry?
  • What should be visible when inspecting a floor drain?
  • What key information is often gathered during a site survey?
  • What is the diameter of #6 rebar in a bundle?
  • What does the term 'retention' refer to in construction contracts?
  • What should a project manager do when a subcontractor submits a field question concerning a conflict in project specifications?
  • How many employees trigger OSHA’s requirement for a written emergency action plan?
  • Which submittal is used to verify that project materials meet contract specifications?
  • What factor is considered crucial when preparing a cost estimate?
  • When should a pocket door be installed?
  • What does 'risk management' involve in commercial construction projects?
  • What type of concrete forms are designed to remain in place indefinitely?
  • What is the 'critical path' in project scheduling?
  • What does an estimator need to consider to determine expected efficiency rate on a jobsite?
  • What are 'environmental assessments' in construction?
  • Which type of soil is known to expand the most?
  • Which plumbing system component prevents backflow and siphonage?
  • What is the primary focus of value engineering in construction?
  • What is the purpose of a trap in plumbing systems?
  • How many legs are present in a 3 phase incoming service?
  • What is the function of base flashing in a construction project?
  • What type of cable can be buried directly under a building without requiring a raceway or conduit?
  • Which document details the quality standards to be adhered to in construction work?
  • What is a 'Gantt chart' used for in project management?
  • After how many days should the grout be cleaned when installing Terrazzo floor?
  • The amount invested by the owner in the business is termed what?
  • What is the minimum temperature for applying Vermiculite plaster?
  • In a subpanel, is it permitted to bond a ground and a neutral?
  • What is the actual size of a 2x4 lumber?
  • What defines a 'fixed-price contract' in construction?
  • What component is essential for securing drywall to framing?
  • How close should the first loop be located from the face of a supporting concrete column?
  • What is typically evenly distributed throughout a construction project?
  • What type of weld is typically used to resist shear and tension loads in structural steel without the need for edge penetration?
  • What is the purpose of project closeout in construction?
  • Why is a site survey important before construction?
  • What are 'liquidated damages' in construction contracts?
  • What is meant by the term ‘scope creep’ in project management?
  • When preserving a tree at a construction site, where should a protective fence be placed?
  • How many legs does a 3 phase electrical panel typically contain?
  • Where is silt fence typically placed?
  • What role does a building inspector play in the construction process?
  • What generally governs the number of electrical outlets required in a residential room?
  • How are metal panels designed to act as a stressed skin attached to a building's structural frame?
  • What are the two primary purposes of documenting cost information?
  • What type of survey is used to establish the amount of cut or fill needed to reach design elevations?
  • What document outlines the roles and responsibilities of each party involved in a construction project?
  • What term describes property where hazardous substances, pollutants, or contaminants are present or potentially present?
  • Which element resists diagonal tension in beams induced by shear stress?
  • Why is effective communication important in construction management?
  • What lateral forces must be absorbed by the structural framing when fixed glass is used as a curtain wall?
  • Which pipe material requires the most horizontal support when installed?
  • What is the minimum size of a trap for a kitchen sink with a food waste dispenser?
  • What does the term 'value engineering' refer to?
  • What does employee labor cost typically include?
  • What constitutes a 'material breach' in a construction contract?
  • What type of materials are considered for temporary offices and facilities on a job site?
  • What is the primary function of a smoke shelf in construction?
  • What is the first step in the construction risk assessment process?
  • A contractor’s obligation to fulfill project requirements is essential to prevent what?
  • When considering labor costs, what external factors must an estimator evaluate?
  • What is the recommended size of the waste outlet for floor drains?
  • What should be taken into account when toenailing trusses to the top plate of an outside wall?
  • What are long cylinders filled with natural materials used to control erosion and sediment called?
  • Before installing oak flooring, what is the necessary preparation step?
  • How can a contractor of a sole proprietorship avoid penalties on Federal Income taxes due on company profits?
  • What defines the legal relationship between the contractor and the owner?
  • What is the percentage of expansion on clay soil that has been excavated?
  • What type of connections are considered when a concrete frame is made of precast sections?
  • What thickness is required for the underlayment when installing sheet vinyl flooring?
  • What kind of risks may be covered by a builder’s risk insurance policy?
  • What is typically included in an initial project proposal?
  • Which component is typically responsible for carrying wastewater away from fixtures?
  • What is a common reason for project delays?
  • In a multi-story structure, how far do steel columns typically extend above the floor level for splicing?
  • Which of the following is NOT considered a 'hard cost' in construction?
  • What does the phrase 'start to start with a 7-day lag' refer to in construction scheduling?
  • What foundation is required for the installation of a brick veneer wall?
  • Which material is primarily used to create ICF concrete forms?
  • Which of the following describes a punch list in construction?
  • How is a contractor's performance assessed during a project?
  • What is a common method for ensuring stability when installing roofing?
  • What type of connection is generally used for connecting portable appliances to the electrical system?
  • During prefab metal frame construction, what should the template used for anchor bolts match?
  • What is the minimum reinforcement required for doors and window openings in structural plain concrete walls?
  • What digital tool supports continual updating and sharing of project data while considering cost and schedule to enhance project productivity?
  • What is the primary purpose of a collar tie in roof framing?
  • How does a hopper window typically operate?
  • What is the minimum size breaker required for an electric furnace?
  • What term describes the process of designating areas on a job site for materials delivery and storage?
  • How many studs are required for a 12-foot wall when framing at 16 inches on center?
  • What is an 'RFP' in the context of procurement for construction projects?
  • Which factor can affect project scheduling?
  • In what scenario are MDF panels particularly ideal for use?
  • When using soffit vents, what should be considered for attic insulation?
  • What is a feasibility study in the context of construction projects?
  • What is another name for stick welding?
  • What is the minimum thickness that OSB (Oriented Strand Board) typically comes in?
  • What is the maximum size for terrazzo flooring tiles?
  • What is included in the as-built drawings at the end of a project?
  • Which of the following best describes the role of a construction contract?
  • What is the minimum acceptable sound-insulating efficiency value for walls and floor assemblies in most buildings?
  • When placing a window into a rough opening, what is the recommended fit for the window?
  • In the context of construction, what does 'negligence' refer to?
  • When is the most value gained from value engineering in a construction project?
  • Which of the following is TRUE regarding the timing of value engineering?
  • What is a 'punch list' in construction?
  • What is an acceptable size of a floor strainer in relation to a floor drain?
  • What action should be taken to maintain project cost control?
Subscribe